Phone line:
Installation of a phone extension: 100 NIS plus VAT.
Minimum per call 0.49 NIS
Each additional minute 0.28 NIS
Dialing a cellular network:
Minimum per call 0.99 NIS
Each additional minute will be charged according to the cellular company’s rate.
International dialing:
According to the rate chart, available at the operation department.
Installation of a direct line from Bezeq 450 NIS
(The charges on this line will arrive about two months after use)
A check deposit for usage: 1000 NIS. In the event of a lost apparatus the exhibitor will be charged 200 NIS.
ISDN line:
A check deposit for minutes used: 1000 NIS.
In the event of a NT apparatus lose the exhibitor will be charged 500 NIS.
In the event an ISDN splitter is lost, the exhibitor will be charged 70 NIS.
The charges for minutes used will arrive from Bezeq according to a fixed date (about two months)
|
The price is for the first 10 orders |
1,200 NIS + VAT |
Installing ISDN line |
|
The price is for the orders above the first 10 |
2,400 NIS + VAT |
Installing ISDN line |
Explanation as per connection via F.R Safer net or LAN
1. Must connect the second port of the axis to the Internet provider.
2. To configure the router including the correct definitions.
3. HUB and network cables.
4. A network card for each computer.
5. Point out the line access code.
Any connection for a data line: it is the exhibitor’s responsibility to handle connections and definitions.
Safenet line:
Must point out address (in the client’s website) at time of order, and the contact person.
| Transfer speed KBS |
Installation rate per line in NIS |
| 19.2 |
3,557 |
| 64 |
3,557 |
| 128 |
3,557 |
| 192 |
5,457 |
| 256 |
7,300 |
| 512 |
11,986 |
| 1024 |
15,714 |
| 1536 |
17,286 |
| 1920 |
18,714 |
LINE FRAME RELAY
Must point out the termination code (at the client’s website) at time of order + CIR and contact person.
INSTALLATION OF FRAME RELAY
|
Transfer speed KBS |
Installation rate per line in NIS |
|
64 |
1,657 |
|
128 |
1,657 |
|
256 |
2,429 |
|
512 |
2,429 |
|
1 Mbit/s |
2,429 |
|
2 Mbit/s |
4,871 |
Additional charge for CIR usage
|
Daily pay in NIS |
CIR Qualifier |
Connection level |
|
5 |
CIR=0 |
Basic |
|
10 |
CIR=19.2 |
Guarded |
|
34 |
CIR=64 |
Guarded |
|
68 |
CIR=128 |
Guarded |
|
137 |
CIR=256 |
Guarded |
Connection to an IPVPN line
Pricing according to technical specifications
General information:
(1) A client who orders an Internet line will receive a cable with RG-45 termination, to connect to the computer.
(2) You must equip the computers with a network card 10/100.
(3) An exhibitor who connects more than one computer must use a HUB 10/100 to connect the computers to the network; including
etwork cables for each computer (internal networking is the client’s responsibility)
(4) Addresses for the computers will be issued automatically by the network.
(5) You must delete other special definitions from the computers, which relate to other networks (fixed IP addresses and proxy
efinitions)
ADSL + phone line
|
Installation fee per line in NIS |
ADSL specifics |
|
1,000 NIS |
Up to 1.5 MB |
|
1,300 NIS |
Up to 2.5 MB |
|
1,500 NIS |
Up to 5 MB |
Daily usage fee as from the sixth day: 5 NIS not including VAT.
In the event of damage/ lose of modem ADSL the applicant will be charged for repair/ new modem.
Check deposit for phone call units: 1,000 NIS.
In the event of the phone unit apparatus the exhibitor will be charged 200 NIS.
General information about ADSL connection
(1) ADSL connection is for 1 computer only.
(2) The computer must be equipped with a network card 10/100.
(3) In order to save on installation time it is recommended to download and install the dialing software WOW on the computer. The
oftware may be downloaded from the Bezeq site http://www.bezeq.co.il
Internet connection options with ADSL:
(1) Pre selection of the Internet provider – coordination and responsibility is on the client. The applicant must obtain a line from the fairs
enter in order to open an account with the supplier. This must be done up to two days before activity starts.
(2) The client will choose a random provider on the opening screen.
Notes for communications applicants
1. The fairs center will install the communications orders up to 1 day before the opening of the fair (provided the order was submitted on
ime). The exhibitors must check the communication one day before the start of the fair, up to 2 PM, in the fairs center area.
(2) An exhibitor who will arrive after 2 PM the checkout and testing of the communication lines will be done the next day.
(3) To all amount must be added VAT according to law.
(4) The payment is to the order of the fairs center.
(5) The fairs center will handle all arrangements with Bezeq (which is responsible for the performance and installation of the above
ervices)
(6) The exhibitor commits to return the equipment (Integrated NT, modems and splitters, network cables and all other equipment)
hich will be supplied by Bezeq for special connections.
(7) Connections in outdoors area: 20 M
2 is free, for each additional M
2– 2.50 NIS.
For additional details: Operations department 03-640-4413
E-mail: oritr@fairs.co.il